Enhancing Urban Tunnelling Efficiency Through Real-Time Geotechnical Parameter Analysis, A Case Study at Kolkata East West Metro Project, KMRCL-1674

Author(s) Arif Sk, Dr. Prof. Sandeep Potnis
Country India
Abstract The exponential increase in urbanization has heightened the demand for a systematic and rapid mass transportation system in developing countries. One efficient solution has been the construction of underground networks of tunnels using Tunnel Boring Machines (TBMs). Urban tunnels, however, require careful attention to minimizing ground disturbances to avoid adverse impacts on existing infrastructure.
The current study focuses on a parametric investigation based on observed trends from the Kolkata East West Metro UG1 project. It undertakes numerical regression to establish correlations, aiming to investigate geotechnical parameters derived from observed operational parameters during tunnel advancement. This correlation allows for the determination and validation of considered geotechnical parameters in real-time, thereby facilitating the optimization of operational parameters.
By establishing correlations, the study examines and validates the effect of geotechnical parameters on observed settlement. In conclusion, the consideration of tunnel operational parameters and subsequent establishment of geotechnical parameters can potentially automate the functioning of mechanized tunnelling, leading to more efficient and effective tunnel construction processes.
Keywords Keywords: Tunnelling, Ground Parameters, Geotechnical Assessment, Tunnel Operational Parameters, Numerical Regression
Field Physics > Civil Engineering
Published In Volume 6, Issue 2, March-April 2024
Published On 2024-03-29
Cite This Enhancing Urban Tunnelling Efficiency Through Real-Time Geotechnical Parameter Analysis, A Case Study at Kolkata East West Metro Project, KMRCL-1674 - Arif Sk, Dr. Prof. Sandeep Potnis - IJFMR Volume 6, Issue 2, March-April 2024. DOI 10.36948/ijfmr.2024.v06i02.15898
DOI https://doi.org/10.36948/ijfmr.2024.v06i02.15898