International Journal For Multidisciplinary Research
E-ISSN: 2582-2160
•
Impact Factor: 9.24
A Widely Indexed Open Access Peer Reviewed Multidisciplinary Bi-monthly Scholarly International Journal
Home
Research Paper
Submit Research Paper
Publication Guidelines
Publication Charges
Upload Documents
Track Status / Pay Fees / Download Publication Certi.
Editors & Reviewers
View All
Join as a Reviewer
Reviewer Referral Program
Get Membership Certificate
Current Issue
Publication Archive
Conference
Publishing Conf. with IJFMR
Upcoming Conference(s) ↓
WSMCDD-2025
GSMCDD-2025
Conferences Published ↓
RBS:RH-COVID-19 (2023)
ICMRS'23
PIPRDA-2023
Contact Us
Plagiarism is checked by the leading plagiarism checker
Call for Paper
Volume 6 Issue 6
November-December 2024
Indexing Partners
Knowledge Transfer of Site Based Construction Management Team of ABC Company: Basis for the Development of Knowledge Transfer Plan
Author(s) | Francisco H. Bernal, Ena A. Bernal |
---|---|
Country | Philippines |
Abstract | The study determines the readiness of ABC Company and the status of the project site based construction management team (CMT) on knowledge transfer (KT) as basis for the development of the proposed knowledge transfer plan (KTP). Descriptive method was used to obtain information on the levels of readiness on organizational characteristics and resources requirement of ABC Company and on the gaps in terms of idea creation, sharing, dissemination, evaluation and adoption in the project site based CMT. Descriptive statistics was used to present the data on readiness; anything below 100% in terms of idea creation, sharing, dissemination, evaluation and adoption was considered a gap. The study revealed that ABC Company has a moderately ready status on its readiness. Improvement was needed on KT strategy, rewards systems, knowledge hoarding, knowledge required, budget, and even on the core and support team that was essential in the development of the proposed KTP. The project site based CMT had gaps to be attended to on idea creation, sharing and dissemination. Those gaps were considered valuable input in the development of the proposed KTP. The development of the proposed KTP was grounded on quality management system that considered the readiness of ABC Company and the gaps found in the project site based CMT as inputs. The proposed KTP composed of four stages, namely, Management Responsibility, Resource Management, Knowledge Transfer Realization and Measurement, Analysis and Improvement. Intervention strategies presented in the KTP would address the particular area determined to be either absent or not consistently implemented with feed forward and feedback for continual improvement. |
Keywords | Communication, Construction Management Operation, Digital Knowledge Repository, Idea Creation, Idea Sharing, Idea Dissemination, Idea Evaluation, Idea Adoption, Knowledge Management, Knowledge Sharing, Knowledge Transfer |
Field | Engineering |
Published In | Volume 6, Issue 3, May-June 2024 |
Published On | 2024-05-05 |
Cite This | Knowledge Transfer of Site Based Construction Management Team of ABC Company: Basis for the Development of Knowledge Transfer Plan - Francisco H. Bernal, Ena A. Bernal - IJFMR Volume 6, Issue 3, May-June 2024. DOI 10.36948/ijfmr.2024.v06i03.19485 |
DOI | https://doi.org/10.36948/ijfmr.2024.v06i03.19485 |
Short DOI | https://doi.org/gttbf6 |
Share this
E-ISSN 2582-2160
doi
CrossRef DOI is assigned to each research paper published in our journal.
IJFMR DOI prefix is
10.36948/ijfmr
Downloads
All research papers published on this website are licensed under Creative Commons Attribution-ShareAlike 4.0 International License, and all rights belong to their respective authors/researchers.