International Journal For Multidisciplinary Research
E-ISSN: 2582-2160
•
Impact Factor: 9.24
A Widely Indexed Open Access Peer Reviewed Multidisciplinary Bi-monthly Scholarly International Journal
Home
Research Paper
Submit Research Paper
Publication Guidelines
Publication Charges
Upload Documents
Track Status / Pay Fees / Download Publication Certi.
Editors & Reviewers
View All
Join as a Reviewer
Reviewer Referral Program
Get Membership Certificate
Current Issue
Publication Archive
Conference
Publishing Conf. with IJFMR
Upcoming Conference(s) ↓
WSMCDD-2025
GSMCDD-2025
Conferences Published ↓
RBS:RH-COVID-19 (2023)
ICMRS'23
PIPRDA-2023
Contact Us
Plagiarism is checked by the leading plagiarism checker
Call for Paper
Volume 6 Issue 6
November-December 2024
Indexing Partners
Preliminary design for the sizing of an emergency thermal power plant (GE) for the continuity of service of a production chain. case of the Kakula concentrator
Author(s) | Ngandu Kamalondo Yannick, Mwamba Wa Munyungu Lebon, Mundjung Nawej Jonathan, Lumanji Mbunga Luc |
---|---|
Country | Congo (Democratic) |
Abstract | This work concerns the preliminary project for the sizing of a thermal power station with emergency generators capable of supplying electrical energy to the Kamoa concentrator located in kakula. The Kakula concentrator, beneficiary of this preliminery project is a plant that concentrates the ore coming from the Kakula mine and having a grade of 5%. After treatement, a copper concentrate of about 55% is obtained and transported for sale. For the choice of generators, the most important element was the determination of the power to be supplied. To do this, we based ourselves on some principales of general electricity. The results enabled us to choose thirteen (13) generators of 4500 kVA of the brand SDMO that we coupled in parallel to obtain a power of 58500 kVA. Then, we chose a 50 MVA transformer to raise the 11 kV voltage produced by generators to a voltage of 33 kV which must be available on the main busbar of the plant. In the end, we proposed a general scheme of the plant with an automatic start system for the generators using an inverter. |
Keywords | generator Inverter Thermal power station Electric Concentrator |
Field | Engineering |
Published In | Volume 6, Issue 4, July-August 2024 |
Published On | 2024-08-01 |
Cite This | Preliminary design for the sizing of an emergency thermal power plant (GE) for the continuity of service of a production chain. case of the Kakula concentrator - Ngandu Kamalondo Yannick, Mwamba Wa Munyungu Lebon, Mundjung Nawej Jonathan, Lumanji Mbunga Luc - IJFMR Volume 6, Issue 4, July-August 2024. DOI 10.36948/ijfmr.2024.v06i04.21433 |
DOI | https://doi.org/10.36948/ijfmr.2024.v06i04.21433 |
Short DOI | https://doi.org/gt5568 |
Share this
E-ISSN 2582-2160
doi
CrossRef DOI is assigned to each research paper published in our journal.
IJFMR DOI prefix is
10.36948/ijfmr
Downloads
All research papers published on this website are licensed under Creative Commons Attribution-ShareAlike 4.0 International License, and all rights belong to their respective authors/researchers.