International Journal For Multidisciplinary Research
E-ISSN: 2582-2160
•
Impact Factor: 9.24
A Widely Indexed Open Access Peer Reviewed Multidisciplinary Bi-monthly Scholarly International Journal
Home
Research Paper
Submit Research Paper
Publication Guidelines
Publication Charges
Upload Documents
Track Status / Pay Fees / Download Publication Certi.
Editors & Reviewers
View All
Join as a Reviewer
Reviewer Referral Program
Get Membership Certificate
Current Issue
Publication Archive
Conference
Publishing Conf. with IJFMR
Upcoming Conference(s) ↓
WSMCDD-2025
GSMCDD-2025
Conferences Published ↓
RBS:RH-COVID-19 (2023)
ICMRS'23
PIPRDA-2023
Contact Us
Plagiarism is checked by the leading plagiarism checker
Call for Paper
Volume 6 Issue 6
November-December 2024
Indexing Partners
A Study on Exploring and Prioritizing Critical Risks in Construction Project Assessment
Author(s) | Allapuram Swetha, M. Gopal Naik, Srikanth Gundurouthula |
---|---|
Country | India |
Abstract | According to Mc Kinsey Report (2015) large construction projects take 20% large time and 80% more budget to get finished. This highlights the importance of Risk Assessment to ensure work safety, cost management and quality construction.The study aims to identify and investigate critical risks in the evaluation of construction projects by utilizing the Principal Component Analysis (PCA) and the Weighted Average Index method. The risk factors for project assessment were identified in the following domains: Budget and Cost Management Risk, Schedule and Time Management Risk, Scope and Planning Risk, Safety and Regulatory Compliance Risk, Resource Management Risk, Communication and Stakeholder Management Risk, and Environmental and Sustainability Risk, through an extensive literature review and expert interviews. A survey was distributed to building operators in Hyderabad, India. The Weighted Average Index technique was used to evaluate 180 completed responses and identify risk indicators. To find underlying patterns, Principal Component Analysis (PCA) was used to gain a better understanding of the connections between these variables. Results identified reliance on essential resources, insufficient risk assessment, cash flow restrictions, and safety issues as top considerations, with currency exchange rate swings and delayed information dissemination ranking lower but still substantial. These insights provide essential advise to stakeholders in order to successfully minimize risks and improve project results. By using systematic risk assessment and management methodologies, building projects in Hyderabad and elsewhere may handle hurdles more effectively, assuring long-term sustainability and resilience. |
Keywords | Construction Risk Factor, Weighted Average Index, Principal Component Analysis. |
Field | Engineering |
Published In | Volume 6, Issue 4, July-August 2024 |
Published On | 2024-08-23 |
Cite This | A Study on Exploring and Prioritizing Critical Risks in Construction Project Assessment - Allapuram Swetha, M. Gopal Naik, Srikanth Gundurouthula - IJFMR Volume 6, Issue 4, July-August 2024. DOI 10.36948/ijfmr.2024.v06i04.26360 |
DOI | https://doi.org/10.36948/ijfmr.2024.v06i04.26360 |
Short DOI | https://doi.org/gt8g6n |
Share this
E-ISSN 2582-2160
doi
CrossRef DOI is assigned to each research paper published in our journal.
IJFMR DOI prefix is
10.36948/ijfmr
Downloads
All research papers published on this website are licensed under Creative Commons Attribution-ShareAlike 4.0 International License, and all rights belong to their respective authors/researchers.