International Journal For Multidisciplinary Research
E-ISSN: 2582-2160
•
Impact Factor: 9.24
A Widely Indexed Open Access Peer Reviewed Multidisciplinary Bi-monthly Scholarly International Journal
Home
Research Paper
Submit Research Paper
Publication Guidelines
Publication Charges
Upload Documents
Track Status / Pay Fees / Download Publication Certi.
Editors & Reviewers
View All
Join as a Reviewer
Reviewer Referral Program
Get Membership Certificate
Current Issue
Publication Archive
Conference
Publishing Conf. with IJFMR
Upcoming Conference(s) ↓
WSMCDD-2025
GSMCDD-2025
Conferences Published ↓
RBS:RH-COVID-19 (2023)
ICMRS'23
PIPRDA-2023
Contact Us
Plagiarism is checked by the leading plagiarism checker
Call for Paper
Volume 6 Issue 6
November-December 2024
Indexing Partners
A Study on 128 Slice MDCT unit in a Tertiary Care Teaching Hospital with Special Emphasis on Work Flow and Break-Even Analysis
Author(s) | BOMMA NIKHILA, K VENKATA KRISHNA REDDY, NIMMA SATYANARAYANA |
---|---|
Country | India |
Abstract | Purpose: To study the Cost Analysis of 128 Slice MDCT unit in a tertiary care teaching hospital Materials and methods: The study followed a biphasic design, comprising both retrospective and prospective components. The retrospective phase involved a record-based analysis conducted over a 3-month period, while the prospective phase included record review, observational methods, interviews, and material evaluation relevant to the study, carried out over the course of 1 month. Results: The cost of running the 128 Slice MDCT unit, including manpower, was calculated for a 3-month period, with an average of 28 cases per day. The unit handles a total workload of 54 TR (15 TR + 35 TR + 4 TR). Power is supplied by a 120KVA UPS located in the unit's UPS room. Depreciation for the building, with a lifespan of 100 years, is set at 1% of the capital cost. For an area of 51.2 sqm, the construction cost totals Rs 19,18,208/-, with a depreciation cost of Rs 47,955/- over 3 months. According to the CPWD manual, the annual maintenance cost is Rs 5104/- per sq.m., resulting in a maintenance expense of Rs 65,331/-. Additional costs for electricity, water, and linen over the 3-month period were also factored in. The breakeven point for the unit is estimated to be 744 days (approximately 2 years and 14 days). Conclusion: Getting each patient into and out of the procedure room in a timely manner can add minutes and maybe even hours to the daily schedules, allowing for the accommodation of a greater number of cases. Increasing the number of procedures performed per day or week can add to overall income. |
Keywords | Cost analysis, Break-even point, Fixed cost, Variable cost, Maintenance cost |
Field | Medical / Pharmacy |
Published In | Volume 6, Issue 6, November-December 2024 |
Published On | 2024-11-05 |
Cite This | A Study on 128 Slice MDCT unit in a Tertiary Care Teaching Hospital with Special Emphasis on Work Flow and Break-Even Analysis - BOMMA NIKHILA, K VENKATA KRISHNA REDDY, NIMMA SATYANARAYANA - IJFMR Volume 6, Issue 6, November-December 2024. DOI 10.36948/ijfmr.2024.v06i06.29892 |
DOI | https://doi.org/10.36948/ijfmr.2024.v06i06.29892 |
Short DOI | https://doi.org/g8qfv5 |
Share this
E-ISSN 2582-2160
doi
CrossRef DOI is assigned to each research paper published in our journal.
IJFMR DOI prefix is
10.36948/ijfmr
Downloads
All research papers published on this website are licensed under Creative Commons Attribution-ShareAlike 4.0 International License, and all rights belong to their respective authors/researchers.